A design-and-build frame package gives the main contractor one point of responsibility for the structure. The frame contractor takes on (or coordinates) the permanent design development, temporary works, falsework and delivery — de-risking the most critical element of the build.
What This Package Covers
- Frame design development and coordination
- Temporary works and falsework design
- Buildability and value-engineering input
- Single-point programme and interface management
- Integrated RC, PT and substructure delivery
When It’s the Right Choice
- Main contractors wanting single-point frame risk transfer
- Schemes where buildability input early adds value
- Complex frames needing tight design-to-site coordination
Frequently Asked Questions
Does design-and-build cost more?
The package price reflects the design and risk the contractor carries, but it often reduces total cost and programme risk by removing interfaces and bringing buildability in early.